CONSTRUCTIONSUBJECT PROJECTYEARINVESTOR
TR 110/27 kV StrakoniceRenovation of 110/27 kV transformers, Substation 27 kV1995České dráhy
JETE TemelinTransformers reserve power supply 110/6kV distrib. point 6kV1995ČEZ
Elektrárna ChvaleticeExchange of 32/16/16 MVA transformer1995ČEZ
EDĚ 4x200 MWReconstruction of 6 kV switchgear power block1997ČEZ
Teplárna TřeboviceExtension of substation 110 kV, 50 MVA transf. installation1997MST
Teplárna PlzeňNew substation 110 kV for powerplant Plzen1997Teplárna Plzeň
TR 110/22 kV VeselíExtension of substation 110 kV1998JČE
TR 110/22 kV BenešovComplete reconstr. of subst. 110kV, 3 stages durin operation1998STE
ECKG KladnoStudy of earthing powerstation1998ECK GENERATING
R 22 kV SázavaConstruction of substation 22 kV, including complex1999STE
TR 110/22 kV NeratoviceTotal reconstruction of substations, 1999STE
Spínací stanice KosmonosyThe new 22 kV switching substation2000STE
MVE Kostelec nad LabemReconstruction of substation 6 kV and transformers stands2000STE-Hydro
R 110 kV Teplárna ZlínNew substation 110 kV for heating plant2000Teplárna Zlín
TR 110/22 kV MilínComplete reconstruction of substation 110kV during operation2000STE
TR 110/22 kV Mladá BoleslavComplete reconstruction of S 110 kV, 22 kV during operation2000STE
TR 400/110 kV DasnýExchange of measuring transformers of 400 kV2000ČEPS
TR 400/110 kV Čechy StředExchange of measuring transformers of 400 kV2000ČEPS
Spínací stanice KladnoThe new 22 kV switching substation2001STE
Spínací stanice 22 kV DobříšThe new 22 kV switching substation2001STE
TR 110/22 kV OvčáryThe new substation for 110/22 kV car factory TOYOTA2002STE
JE DukovanyReconstruction of two S 110kV power reserve of nuclear power2003ČEZ
SP Energocentrum, Kralupy nad VltavouReconstruction of switching substation 22 kV 2003STE
Generální oprava soustrojí TG4 ve vodní el. DalešiceExchange the generator switch and LV switchgear technology2003ČEZ Vodní elektrárny
TR 110/22 kV Kutná HoraReconstruction of substation 110 kV2003STE
Trafostanice TRII na DNTComplete reconstru of substation 110/22 kV, during operation2003Severočeské doly
TR 110/22 kV StrančiceComplete reconstruction of substation 110kV during operation2003STE
Rekonstrukce rozvodny 22 kV závod ŽelivkaReconstruction of power supply S 22 kV during operation2003PVS
Rekonstrukce vnitřní R 110 kV KomořanyComplete reconstr. of S 110 kV, 17 fields, two system busbar2003United Energy
R 110 kV TýnecComplete reconstr. of substation 110 kV, during operation2004STE
Generální oprava R 6 kVReconstruction cell substation 6 kV2004Lovochemie
Instalace generátorového vypínače bloku TG3Adding generator switch2004ČEZ Elektrárny Poříčí
R 110 kV Konice, instalace T102Additional equipment of S 110 kV and 110/22 kV Tr installed 2004Jihomoravská energetika
Rekonstrukce rozvodny 22 kVReconstruction of power supply S 22 kV during operation 2004Škoda Auto
TR 110/22 kV PísekRepair field lines of substation 110 kV2005E.ON Česká republika
Rekonstrukce energetické infrastruktury hutních provozůReconstruction of power supply S 22 kV for car factory2005Škoda Auto
R 110 kV LipniceReconstruction of substation 110 kV2005E.ON Česká republika
Parní kondenzační turbina TG6 Extension S 110kV, incl. 63MVA transf. block for powersubst 2005Mondi
TR Řeporyje – ochrany transformátorů 110/22 kVExchange electrical protections of power transformers2006ČEZ Distribuce
Modernizace TR II - část 35 kV, náhradní napájení 35 kVReconstr. of outdoor power supply S 35 kV to indoor substat.2006Severočeské doly a. s.
Oprava R 110 kV Lesní BránaReconstruction of substation 110 kV, during operation2006Glaverbel Czech a.s.,
TR 110/22 kV MělníkTotal reconstruction of substation 110/22kV during operation2006ČEZ Distribuce
Oprava R110 kV Lesní BránaReconstruction of substation 110 kV, during operation2006GLAVERBEL
Rekonstrukce rozvodny 110 kV v TKY - 2.etapa KomořanyReconstruction of indoor S 110 kV during operation, 2th stag2006United Energy, a. s
Rekonstrukce rozvodny 110/10 kV č. 514Reconstr. of trans. substation of the St. Petersburg area2007Lenenergo - St. Petersburg -Russia
EVP NIKŠIČReconstruction of railway substation2007ŽELJEZNICA CRNE GORE A.D.
Rekonstrukce rozvodny 110kV v TKY - 3.etapaReconstruction of indoor S 110 kV during operation,3th stage2008United Energy, a. s.
Modernizace rozvodny LipniceReconstruction of substation 110 kV, during operation2008Sokolovská uhelná, právní nástupce, a.s.
Modernizace rozvodny LipniceReconstruction of substation 110 kV, during operation2008Sokolovská uhelná, právní nástupce, a.s.
TR 110/22 kV Mnichovo HradištěNew substation2008ČEZ Distribuce, a.s.
Rekonstrukce trakční napájecí stanice EVP PodgoricaReconstruction of railway substation2008ŽELJEZNICA CRNE GORE A.D.
Rekonstrukce rozvodny 110/10 kV č. 210Reconstr. of transformer S of the St. Petersburg area2008Lenenergo- St. Petersburg - Russia
Modernizace TR IV BřeznoThe new substation in the area of DNT2008Severočeské doly a.s.
TR 110/22 kV ChýněNew substation2009ČEZ Distribuce, a.s
Rozvodna 132/33/11 kV, ErbilNew substation2009Place of realization Iraq
Hydrocracker Komplex INA Rijeka, Rafinery, Ochrany 35 a 6 kVProject of electrical protections2009Siemens s.r.o.
Fotovoltaická elektrárna Spomyšl, VepřekNew photovoltaic power plant 34 MWp2009Decci a.s.
Fotovoltaická elektrárna ŠevětínNew photovoltaic power plant 32 MWp2010FVE Sevetin s.r.o.
Optimalizace výroby elektřiny v teplárně Dvůr KrálovéReconstruction cell substation 35 kV2010ČEZ EPO
Fotovoltaická elektrárna Moldava INew photovoltaic power plant 6,6 MWp2010Talwin a.s.
Paroplynový zdroj 880 MWe v elektrárně PočeradyNew substation 400 kV2011ČEZ EPO
Rozvodna VN 22 kV - ČesanaReconstruction substation2012ŠKODA AUTO, a.s.
Rozvodna 110/35 kV - VrchlabíPower supply Vrchlabí plant2012ŠKODA AUTO, a.s.
Synthos Kralupy PC3The power output and modification of the existing substation2013Tamero Invest a.s.
Rozvodna 110 kV Dukla Reconstruction substation R 110 kV 2014Dalkia a.s.
Ekologizace energ. zdroje, LovochemieArrangement in substation 110 kV2014Lovochemie a.s.
Adjusting concept electricity supply SD a.s. - DNT Ensuring electr. supply DNT from the gen.I and III ETU III2015Severočeské doly a.s.
Sub. 110/35 KV Škoda Auto Vrchlabí and connection to the SBEnsure supply of the volt. level 110 kV Škoda Auto Vrchlabí2016Škoda Auto Vrchlabí
Substation 110/6 kV Šlapanov Reconstruction substation 110 kV2016ČEPRO a.s.
Substation 110/22 kV Kavalierglass SázavaDevice recovery substation 110 kV2017Kavalierglass a.s.
Substation 110/22 kV PísekReplacement of the transformer 110 kV2017E.ON s.r.o.
Substation 110/22 kV VimperkReplacement of the transformer 110/22 kV2017E.ON s.r.o.
Substation 110/6 kV Boršice u BlatniceNew substation 110/22 kV2018E.ON s.r.o
The new concept of electricity supply the Bílina mineEnsuring electr. supply to the Bílina mine from the gener. of the Ledvice PP2018Severočeské doly a.s.
Reconstruction substation 6 kV PPC, 1. a 2. blocReplacement substations 6 kV2018Sokolovská uhelná, právní nástupce, a.s.
Modernization substation TR4-BřeznoReconstruction substation 35 kV2019Severočeské doly a.s.
Reconstruction substation R6 kV Foxconn PardubiceReconstruction substation 6 kV2019Foxconn Pardubice
Substation Louny, replacement of protections, CS, VSReconstruction subst. 110/22 kV - replacement of protections2019ČEZ Distribuce a.s.
Substation Rakovník – completion of T102, úprav. ŘS, R22kVCompletion of the transformer 110/22 kV and substation 22 kV2020ČEZ Distribuce a.s.
The power supply concept of the factory Škoda MBStudy of the power supply concept of the factory ŠKODA MB2020ŠKO-ENERGO, s.r.o.